Water and hydraulic basis
Record source water and the available quality analysis. List minimum, normal and peak system flow rate in gpm or m³/h, together with operating pressure in psi or bar. State the measurement locations and simultaneous zone demand. Ask the factory to identify any assumptions if a value is not yet known.