Separate base scope from options
Ask for injection technology, chemical contact materials, control panel, power supply and pipe connections by name. Request dimensions and a hydraulic diagram. Pumps, filters, stock tanks and backflow protection should be explicitly included or excluded rather than left inside a vague system label.
